S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering. | 6.75 | 882 | 5953.5 |
2 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 12 mm graded metal is used | 4.73 | 3307.4 | 15644.002 |
3 | False work for R.C.C. and P.C.C. work in plinth and foundation | 18 | 147.8 | 2660.4 |
4 | Random / uncoursed rubble masonry in plinth and foundation with mud mortar including levelling at plinth level. | 63 | 1079 | 67977 |
5 | Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height | 125 | 59.1 | 7387.5 |
6 | Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Ruled pointing | 192 | 78.5 | 15072 |
7 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 1 | 49082.69 | 49082.69 |
8 | Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed | 27 | 52.7 | 1422.9 |