State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: MOHANGARH(P)
Work Code: 1703004067/AV/22012034621911 (CPW Nirman Anganwadi Bhavan Parisar Mohangarh)
Work Category: Anganvany
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2022-2023 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 16/8/2022 Work start date : 12/9/2022
Present status : NEW Proposed Status : Constr of CmpOnd wall for gov schools for Comm
Tech Sanction Details
Technical Sanction No. : 4067/2066 Sanction Date : 30/8/2022
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
SK/SemiSK Est. Skilled Cost Est. Semi-Skilled Cost 15th Finance Commission scheme2 scheme3 Total
117900 78720 0 0 22380 0 0 102000 0 219000
Financial Sanction Details
Financial\Administrative Sanction No: AS-4067/08 Financial\Administrative Sanction Date 11/9/2022
Fin. Sanc. Amt. (in Rs) NREGA:196620 15th Finance Commission
22380
Scheme 2
0
Scheme 3
0
Total
219000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering.7.21374.669897.552
2Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)2.613823.549979.4394
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)3.63823.5413764.744
4Random / uncoursed rubble masonry in plinth and foundation with mud mortar including levelling at plinth level.32.41212.1539273.66
5Coursed rubble masonry second sort in plinth and foundation.-In Cement mortar 1:6 (1cement, 6sand)34.611498.6551868.2765
6Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height10086.068606
7Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Ruled pointing171.15184.0331496.7345
8White washing whith lime on undecorated wall surfaces (two coats) to give an even shade including thoroughly broomed the surface to remove all dirt, dust, mortar drops and other foreign matter.169.4910.091710.1541
9Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.14244742447
10Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil36136.34906.8
11SIGN BOARD15049.635049.63
Total Activity 219000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL5.2711436023.61
240 M.M. METAL7.211438229.6
3Cement4531013950
4Convergence Amount119816.4919816.49
5Display board150005000
6Iron angles, Trusses, wind tie186008600
7moorum302136390
8Sand3.38912940.3
9TRAINSPORT CHARGE6745030150