S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Dag-beling-Single spade stroke minimum 75mm deep | 0.3 | 340 | 102 |
2 | Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering. | 467.3 | 12.94 | 6046.862 |
3 | Random / uncoursed rubble masonry in plinth and foundation with mud mortar including levelling at plinth level. | 0 | 0 | 0 |
4 | Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height | 0 | 0 | 0 |
5 | Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Raised and cut pointing | 109.7 | 345 | 37846.5 |
6 | Dubbing out on old irregular walls average 10mm thick with.-Cement mortar 1:3 (1Cement, 3Sand) | 458 | 18.4 | 8427.2 |
7 | Collection of rubble masonry (size 0.014cum to 0.06cum) other then black trap, basalt or granite. | 527.8 | 127.08 | 67072.824 |
8 | Stacking without boxing.-Masonry stones, pitching stones or boulders | 29.5 | 127.08 | 3748.86 |
9 | Transportation of metal | 1 | 158000 | 158000 |
10 | Transportation rates for Boulders, Laterite, rubble pitching stones and excavated hard rock. | 529.5 | 127.08 | 67288.86 |
11 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Loose or soft soil | 96.2 | 64.69 | 6223.178 |
12 | Collection of soft moorum including stacking at quarry. | 122.8 | 57.64 | 7078.192 |
13 | Collection of hard metal other then black trap basalt and granite for road works (without blasting) including stacking as per MOST 1995, clause 400.2.5-Grading-2 (Size ranging from 63 mm to 45 mm) | 490 | 12.94 | 6340.6 |