S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | (I) Lead upto 100 Metres | 947.49 | 36.7917867207042 | 34859.85 |
2 | (I) 0.5 Km. Lead -- | 1168.82 | 89.9293475470988 | 105111.22 |
3 | (IV) 2.0 Km. Lead | 47.43 | 111.753953194181 | 5300.49 |
4 | Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making 4% camber and required Grade by tractor mounted grader or labourers, watering at OMC and compacted by 80 to 100 kN static weight rollers to achieve desired density minimum 97% as per table 300.1 and 300.2 of (MORD) - i/c required leads and lifts of materials etc. complete. | 2916.31 | 17.3729370334429 | 50664.87 |
5 | (c) Metal 40 mm nominal size | 49.92 | 838.601161858974 | 41862.97 |
6 | (a) Boulders | 146.24 | 579.545951859956 | 84752.8 |
7 | For earthen dam - puddle filling of good clay including lead upto 20 meter including mixing, watering & kneading by tamping , ramming & laying etc. | 126 | 428.469285714286 | 53987.13 |
8 | (c) Hard moorum for Tank Work, lift of up to 3m depth | 30 | 160.672666666667 | 4820.18 |
9 | Site clearance, cutting grass, raking into heaps and removing off the premises | 2700 | 2.66691481481481 | 7200.67 |
10 | b (iii) Dense or hard soil for Tank Work | 1344.82 | 136.306249163457 | 183307.37 |
11 | c (iii) Hard moorum for Tank Work | 1034.99 | 181.559928115247 | 187912.71 |
12 | (a) Dense or hard soil | 15 | 146.12 | 2191.8 |
13 | Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point. | 47.43 | 228.122074636306 | 10819.83 |
14 | 22cm thick dry stone pitching ( without quarry spalls ) with individual stone of 22 cm depth and minimum size 0.014 cum | 599.04 | 370.255792601496 | 221798.03 |
15 | Citizen Information Board Size 0.9 Meter x 1.2 Meter ( Community Works ) | 1 | 3644.01 | 3644.01 |