S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil | 143.04 | 146 | 20883.84 |
2 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 48.48 | 3159.3 | 153162.864 |
3 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal) | 48.48 | 3904.3 | 189280.464 |
4 | False work for R.C.C. and P.C.C. work in plinth and foundation | 62.5 | 156.7 | 9793.75 |
5 | Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing. | 97.76 | 73.6 | 7195.136 |
6 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 8.50 m. to 9.00 m. | 97.76 | 208.2 | 20353.632 |