Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Jun-2024 05:33:22 AM 
Back  
State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: SURPURA
Work Code: 1702001069/OP/9425888883 (Cattle protecation wall Swami Vivekanand High School Surpura)
Work Category: Other Works
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/1/2016 Work start date : 7/2/2016
Present status : 00 Proposed Status : 00
Tech Sanction Details
Technical Sanction No. : 2758/5 Sanction Date : 28/1/2016
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
156000 104000 0 0 360000 0 0 464000 0 620000
Financial Sanction Details
Financial\Administrative Sanction No: 5/2758 Financial\Administrative Sanction Date 2/2/2016
Fin. Sanc. Amt. (in Rs) NREGA:260000 Panchparmeshwar
360000
Scheme 2
0
Scheme 3
0
Total
620000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m88.48393450.72
2Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering.13.8288212189.24
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)1.672809.54691.865
4Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1.5:3 (1cement, 1.5sand, 3graded stone aggregate 20 mm nominal size)38.6243320.2128239.4048
5False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift121195.423643.4
6False work for R.C.C. and P.C.C. work in plinth and foundation144130.518792
7Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:6 (1cement, 6sand)58.52849.4166689.9
8Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height24561.315018.5
9Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars179350.891084.4
1010mm thick cement plaster on fair side of wall in-Cement mortar 1:5 (1cement, 5sand)50899.450495.2
11Colour washing 2 coats over and including a primary coat of white washing on undecorated wall surface.67710.36973.1
12Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.16000060000
13Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti11196.210678.2
14Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil69.1296.26649.344
15contingency12100021000
Total Activity 620000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL40140056000
2BRICK325004130000
3CEMENT (BEGS)360280100800
4Centering and Shuttering2708021600
5Lime Powder15071050
6sand cum60120072000
7Steel Board18254073000
8Transportation charges190009000
Total Material 464000