S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 500 | 500 |
2 | Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead | 70 | 87.6 | 6132 |
3 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. | 26.96 | 108 | 2911.68 |
4 | Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders. | 70 | 127.4 | 8918 |
5 | contingency | 1 | 500 | 500 |