S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard Moorum | 75.36 | 186 | 14016.96 |
2 | Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting) | 25.12 | 523 | 13137.76 |
3 | Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting. | 1 | 507000 | 507000 |