S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil | 41.25 | 117.5 | 4846.875 |
2 | Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead | 41.25 | 118.8 | 4900.5 |
3 | Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete. | 24.75 | 276.6 | 6845.85 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 26.4 | 3235.4 | 85414.56 |
5 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 22 | 2562.8 | 56381.6 |
6 | False work for R.C.C. and P.C.C. work in plinth and foundation | 44 | 155.3 | 6833.2 |
7 | Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide) | 59.93 | 9.2 | 551.356 |
8 | Field Technical Supervisior Charge-FTSC | 1 | 4000 | 4000 |