State: MAHARASHTRA District: GADCHIROLI Block: GADCHIROLI Panchayat: AMIRZA
Work Code: 1830001013/WH/473459155 (BN खाती बोडी (सरकारी) सर्वे क्र.17 (2021-2022) ग्रा.पं. अमिर्झा)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2021-2022 Execution Level : GP
Execution Agency : Gram Panchayat (3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 17/11/2021 Work start date : 25/11/2021
Present status : Weak Embankment Proposed Status : Renovation of Fisheries Ponds for Community
Tech Sanction Details
Technical Sanction No. : 1830001/2021-2022/184658/TS Sanction Date : 30/11/2021
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
152331.4 22570 0 0 0 0 0 22600 4570 179471.4
Financial Sanction Details
Financial\Administrative Sanction No: 1830001/2021-2022/184658/AS Financial\Administrative Sanction Date 30/11/2021
Fin. Sanc. Amt. (in Rs) NREGA:179471 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
180000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Excavation in earth for all sorts of soil & silt, lime, shadu, sand/ grit, such types of strata including dressing and conveying the excavated material by head and upto a distance of 10m and laying or spreading or filling in furrahas in layers of 30cm thick upto lift of 1:50m as directed. (A) Excavation - (In General) Rate for the area635.74105.4000062918867007
2Excavation in earth for soft murum type of strata including dressing and converying the excavated material by head load upto a distance of 10m and laying or spereading or filling in furrahas in layers of 30cm. Thick upto a lift of 1.50m as directed. (A) Excavation - (In General) rate for the othe area272.46132.92798942964136217.56
3Additional rate of additional lead by head load for all kind of soil, sand, soft murum, hard murum, stones, pebbles,boulders, rock. (Additional lead of 10 m. in other area)363.2824.40318762387148865.19
4Additional rate of additional lead by head load for all kind of soil, sand, soft murum, hard murum, stones, pebbles,boulders, rock. (Additional lead of 20 m. in other area)363.2845.136010790574816397.01
5Constucting casing or Hearting at embankment site with the following sorts of materials conveyed, removing trees, bushes, grass roots, etc. breaking clods and spreading the same in layers for embankement with earth work and dressing upto required level. (A) For Soil, soft murum and hard murum and boulder materials. For General area.454.19.919995595683774504.67
6Extra rate of additional lift of 1.5 m and/or its part for conveying material obtained from all types of strata from pit / borrow area. Additional lift 1.5 m in other area.272.4659.941606107318516331.69
7Man days for unskilled12.132483008.24
8Lum sum Material for all works.15000115000
Total Activity 168000
S.NoMaterialQuantityUnit PriceTotal
110-Miscellaneous /Contingencies charges145704570
23-Display Board130003000
37-Worksite facilities/Creche/Drinking water/First aid145704570
4MR6533-Material cost Rs 1/- per unit.15000115000
Total Material 27200