Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Sep-2024 11:41:29 PM 
Back  
State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: LALGAON
Work Code: 1713004009/AV/22012034627843 (लघु मूलक कार्य ईजीएस प्राथ0 शाला अटरिया कोलान में)
Work Category: Anganvany
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2022-2023 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 2/10/2022 Work start date : 25/12/2022
Present status : NEW Proposed Status : Constr of GP for community
Tech Sanction Details
Technical Sanction No. : 1623/009/2022 Sanction Date : 19/12/2022
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
SK/SemiSK Est. Skilled Cost Est. Semi-Skilled Cost 15th Finance Commission scheme2 scheme3 Total
58000 0 0 0 307000 0 0 307000 0 365000
Financial Sanction Details
Financial\Administrative Sanction No: 02/009/2022 Financial\Administrative Sanction Date 20/12/2022
Fin. Sanc. Amt. (in Rs) NREGA:58000 15th Finance Commission
307000
Scheme 2
0
Scheme 3
0
Total
365000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Boring holes 3.5m deep in ordinary soil (for cast in situ piles) and getting out the soil (under ramming if any shall be paid for separately) and disposal of the surplus excavated soil as directed within a lead of 50m for-Diameter of piles.-250 mm26608.5715822.82
2Filling foundation and around masonry work with moorum I/c ramming layers and watering.33.75277.699372.0375
3Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1.5:3 (1cement, 1.5sand, 3graded stone aggregate 20 mm nominal size)8.185348.1243747.6216
4Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:6 (1cement, 6sand)24.373937.9395967.3541
5Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height17087.1614817.2
6Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars933.5172.3867567.4538
715mm thick cement plaster on rough side of wall in-Cement mortar 1:5 (1cement, 5sand)247.9151.337507.27
8White glazed tiles 6mm thick in flooring, treads of steps and landings laid on a bed of 12mm thick cement mortar 1:3 finished with flush pointing in white cement.57.811108.1364060.9953
9Distempering with dry distemper of approved brand and manufacture (two coats) and of required shade on undecorated wall surfaces to give an even shade, over and including priming coat of whiting after thoroughly brushing the surface free from mortar dropp261.5754.7214313.1104
10Painting with enamel paint, brushing, interior to give an even shade I/n cleaning the surface of all dirt dust and other foreign matter on steel and other metal surfaces.-2 coats16.8870.111183.4568
Total Activity 365000
S.NoMaterialQuantityUnit PriceTotal
1Convergence Amount1307000307000
Total Material 307000