Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Sep-2024 04:28:02 PM 
Back  
State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: DEVRIKALA(P)
Work Code: 1703004033/RC/22012034182324 (खरंजा निर्माण मैन रोड से साहब सिंह के मकान तक)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 15/4/2013 Work start date : 12/9/2013
Present status : Earthern road Proposed Status : Kharanja (Brick/Stone)
Tech Sanction Details
Technical Sanction No. : 33/361 Sanction Date : 12/7/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
47979.4 22413 0 0 0 0 0 22500 0 70392.4
Financial Sanction Details
Financial\Administrative Sanction No: 33/27 Financial\Administrative Sanction Date 15/8/2013
Fin. Sanc. Amt. (in Rs) NREGA:70392 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
70400
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Dag-beling-Single spade stroke minimum 75mm deep1000.220
2Providing and fixing in cement mortar 1:6 (1cement, 6sand) flag stone slab over drains.-30 mm thick70218.615302
3Hammer dressed 15cm thick stone paving laid in camber in moorum bedding and filled with moorum mortar.150215.732355
4Transportation rates for Masonry stone.22.5206.644649.4
5Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock.34.96132.844644.0864
6Loading of metal in truck, dumper etc.34.9626.38922.2448
7Unloading of metal in truck, dumper etc.34.9613.14459.3744
8Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.34.96411433.36
9Collection of hard moorum including stacking at quarry.34.96130.84572.768
10Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Dense or hard soil.18512.82368
11contingency13669.953669.95
Total Activity 70400
S.NoMaterialQuantityUnit PriceTotal
1Convergence Amount13669.953669.95
2Transportation charges22.5206.644649.4
3पत्‍थर फर्सी701359450
4मुरम परिवहन (1)34.96132.844644.0864
Total Material 22500