State: MADHYA PRADESH District: DHAR Block: BADNAWAR Panchayat: Manglya
Work Code: 1722001022/WC/22012034441050 (निस्तार तालाब निर्माण (बांडीनाला के पास) )
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2018-2019 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 26/1/2019 Work start date : 15/2/2019
Present status : Existing Proposed Status : Construction of Earthen graded Bund for Community
Tech Sanction Details
Technical Sanction No. : 1003/22 Sanction Date : 8/2/2019
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
916348 493468 0 0 0 0 0 494000 0 1409816
Financial Sanction Details
Financial\Administrative Sanction No: 701/22 Financial\Administrative Sanction Date 15/2/2019
Fin. Sanc. Amt. (in Rs) NREGA:1409816 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1410000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises2405.1337215.39
2Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard moorum148.14155.823080.212
3Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)275.11369.5101653.145
4Extra for every additional lift of 1.5 m or part there of-Loose/soft soil and dense/hard soil1244.5410.713316.578
5Extra for every additional lift of 1.5 m or part there of-Disintegrated/ soft or hard rock2703.5321.457855.542
622cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014781.99165129028.35
7Transportation of metal 3948.0792.16363854.1312
8Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making3948.0716.966722.383
9FOR EARTHEN DAM - Puddle filling of good clay including lead upto 50m including mixing watering and kneeding by tamping ramming and laying etc.521.51474247195.74
10FOR EARTHEN DAM - Construction of rock toe in earthen embankments including laying and hand packing, dressing, wedging and finishing over surface with.-Boulders267.46574.6153682.516
11Lossening of hard soil by ploughing the existing gound4426.172.711950.659
12Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed4426.1750221308.5
13Field Technical Supervisior Charge-FTSC12952112952
Total Activity 1410000
S.NoMaterialQuantityUnit PriceTotal
1Boulder Transportation267.46344.7692209.5096
2FTSC-Field Technical supervisi12952112952
3Lead of Casing Soil 0.50 Km2703.5370.56190761.0768
4Mixher Machine4426.172.711950.659
5pitching stone781.999977417.01
6Transportanion of harting soil1244.5466.2882488.1112
7Transpotation of Puddle Earth521.5149.2325673.9373
8सम्‍पुर्ण सामाग्री क्रय000
Total Material 494000