S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Ordinary shrub jungle (areas below 25% covered by shrubs) clearance involving removal of grass. Shrubs, bushes and twigs, excluding uprooting (for survey works) | 72 | 1.12375 | 80.91 |
2 | Providing and fixing barbed wire fencing with 5 rows of horizontal barbed wire and 2 digonal rows tightened to RCC post as per IS:4996-1984, 2M long, 1.4 m above and 0.6 m belowe ground level, c/c spacing of each post shall not exceed 3M with diagonal strut at every 30M to hold the fencing in line and level. Top and bottom section of RCC post shall be 100mm X 100mm and 150mm X 150mm respectively, with iron pins casted in post. The weight of two ply GI barbed wire shall not be less than 9.38 kg per 100 m lenght of wire. The RCC post shall be casted in M-20 cement concrete as per IS:456-2000, with reinforcement as per IS:432-1982, 10mm dia 4 nos longitudinal bars and 6mm dia stirrups @ 150mm c/c, complete with cost of excavation & filling cement concrete M-15 grade for fixing posts & struts to the pit of size 0.30x0.30x0.60 M for each post and struts etc. complete. | 400 | 270.172675 | 108069.07 |
3 | (a) Dense or hard soil (PT/60/60) | 64.8 | 185.799074074074 | 12039.78 |
4 | Citizen Information Board Size 0.9 Meter x 1.2 Meter ( Community Works ) | 1 | 4175.75 | 4175.75 |
5 | Filling dug pits with manure/compost for dug-pit size 0.60x0.60x0.60 m (using Manure and Excavated earth for filling) | 300 | 13.3792 | 4013.76 |
6 | (I) Pit Size : 0.60 x 0.60 x 0.60 m, height less than 1.5 feet | 380 | 18.5546052631579 | 7050.75 |
7 | Watering , Weeding (15 days interval), Hoeing, Training & Pruning (1 month interval), Mulching (only in summer season), Stacking, Bunding, along sides (thala making), filling the soil in and around the plants, dewatering in case of water logging in rainy season, spraying insecticide/pesticide, putting required manure, fertilizer etc, complete supervision (in case of survival more than 80%) for first year (for road side/ canal/ सार्वजानिक plantation) Note: watering frequency to be increased during summer season. | 200 | 233.20295 | 46640.59 |
8 | Watering , Weeding (15 days interval), Hoeing, Training & Pruning (1 month interval), Mulching (only in summer season), Stacking, Bunding, along sides (thala making), filling the soil in and around the plants, dewatering in case of water logging in rainy season, spraying insecticide/pesticide, putting required manure, fertilizer etc, complete supervision (in case of survival more than 80%) for second year (for roadside/ canal/ सार्वजानिक plantation) Note: watering frequency to be increased during summer season. | 200 | 286.00605 | 57201.21 |
9 | Watering , Weeding (15 days interval), Hoeing, Training & Pruning (1 month interval), Mulching (only in summer season), Stacking, Bunding, along sides (thala making), filling the soil in and around the plants, dewatering in case of water logging in rainy season, spraying insecticide/pesticide, putting required manure, fertilizer etc, complete supervision (in case of survival more than 80%) for Third/Fourth/Fifth year (for road side/ canal/ सार्वजानिक plantation) | 600 | 286.00605 | 171603.63 |
10 | Providing earthen pot , to be laid in the soil after planting.(labour component included in the activity of watering) | 80 | 50 | 4000 |
11 | (VIII) 81 to 100 km | 280 | 2.76271428571429 | 773.56 |
12 | Providing Bucket/Can for carrying water for watering plants for community plantation | 5 | 750 | 3750 |
13 | Maintenance of the bicycle of paudhrakshak | 5 | 500 | 2500 |
14 | Supervision Charges for GP in Community Plantation and खेत की मेड पर वृक्षारोपण (individual plantation) Per Year | 5 | 2000 | 10000 |
15 | Supervision Charges for Paudhrakshak for Road side/Canal side/ Community block/ Community compound Plantation Per Year(पर्यवेक्षण शुल्क पौधरक्षक, प्रतिवर्ष हेतु : सड़क किनारे/ नहर किनारे / सामुदायिक/ सार्वजनिक परिसर हेतु वृक्षारोपण ) | 5 | 2000 | 10000 |
16 | Providing and fixing bamboo tree guard with 12 rows of horizontal split bamboo tightened to bamboo poles 2m long, 1.7m above and 0.3m below ground level, 4 numbers in each tree guard. Average dia of bamboo pole shall be 8cm to 12cm. The spit bamboo used shall be 80cm in length having average dia 25mm and c/c spacing of split bamboo will be 13cm. | 280 | 359.979857142857 | 100794.36 |
17 | Provision for Mate | 25 | 392 | 9800 |