State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: PURABANWAR(P)
Work Code: 1703004045/DP/594 (shntidham porabanwar)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2012-2013 Execution Level : ZP
Execution Agency : Horticulture Department(13) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 27/7/2011 Work start date : 27/7/2011
Present status : Not Exist Proposed Status : Afforestation
Tech Sanction Details
Technical Sanction No. : 045/482 Sanction Date : 28/10/2011
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
380000 377000 0 0 0 0 0 377000 0 757000
Financial Sanction Details
Financial\Administrative Sanction No: 045/41 Financial\Administrative Sanction Date 22/11/2011
Fin. Sanc. Amt. (in Rs) NREGA:757000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
757000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.3303.41122
2Contingency128975.2128975.21
3Dag-beling-Single spade stroke minimum 75mm deep6100.2122
4Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering.31.075809.925167.6425
5Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)1.581743.22754.256
6Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal)2.231514.43377.112
7Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:5:10 (1 cement, 5sand, 10metal)000
8Providing and laying damp proof course 50mm thick with C.C.1:2:4 with 20mm size graded stone aggregate. including curing.247.5142.935367.75
9False work for R.C.C. and P.C.C. work in plinth and foundation10.56116.41229.184
10Random / uncoursed rubble masonry in plinth and foundation with mud mortar including levelling at plinth level.286.825784.7225071.5775
11Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:8 (1cement, 8sand)10.541278.313473.282
12Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height638.457.336580.32
13Pointing on CR masonry with cement mortar 1:4(1cement, 4sand)-Raised and cut pointing100448.648794.4
14Providing corrugated C.I. sheet of class III roofing fixed with galvanised iron J or L hooks bolts and nuts 8mm diameter with bitumen and G.I. limpet washers or with complete excluding the cost of purlins, rafters and trusses.-0.80 mm thick sheet.19.2621.711936.64
15Second class brick flooring laid dry grouted with C.M. 1:6 i/c finishing the joints flush.14.08226.53189.12
16Transportation of 20 MM metal10.45345.93614.655
17Transportation of sand24.625162.814009.19625
18Transportation rates for Masonry stone.299.29310.192809.829
19Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock.35.835198.37106.0805
20Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.139.515147.1520529.63225
21Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN14.430432
22Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil323.65573.823885.739
23Collection of hard moorum including stacking at quarry.40.74109.34452.882
24Transportion of metal028975.220
25TRANSPOTATION OF CEMENT4.725147.15695.28375
26All maintainance of plants after transplanting work inclusive of Irrigation, Interculture operation, spray of pesticides, thala construction, earthing up etc.e with securty for first year per 675 plants.331.512240443
27All maintainance of plants after transplanting work inclusive of Irrigation, Interculture operation, spray of pesticides, thala preparation, earthing up etc. with securty for second year per 675 plants.30612237332
28All maintainance of plants after transplanting work inclusive of Irrigation, Interculture operation, spray of pesticides, thala preparation, earthing up etc. with securty for thirdyear per 900 plants.30612237332
29Supply of farm yard mannure (FYM) to the plantation site.8510850
30Supply of vermi compost110.56663
31Supply of singal super phosphate (SSP)110.56.6729.3
32Supply of muriate of potash (MOP)110.517.81966.9
33Supply of urea.110.56663
34Supply of Neem cake25.520510
35Supply of graphted foresty or horticulture Plant 1.5 to 2 feet plant height110.5202210
36Supply of Plant protection pesticides per plant, a-foresty plant, b- fruit plant.110.5101105
37Rent for water Tankar of capacity 5000 Litre including tractor, diesel, driver etc. complete for one day.5570038500
Total Activity 757000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL10.451245.913019.655
2AC SHEET 1019.2621.711936.64
3Boulder Transportation299.29310.192809.829
4Bricks8003.52800
5CEMENT(BEGS)14526838860
6contigency15204852048
7IRON GATE 2638.464.741304.48
8PhotoCopy & Stationary20051000
9Sand (mortar)24.625762.8118784.19625
10Seedlings / Graft cost110.5202210
11Transportation charges8080064000
12Transportation Of Material189.43198.337563.969
13वर्मी कम्‍पोस्‍ट110.56663
Total Material 377000