The Mahatma Gandhi National Rural Employment Guarantee Act 26-Sep-2024 10:18:44 AM 
Back  
State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: AITHAAR
Work Code: 1702001027/RC/22012034469762 (सी.सी.रोड पप्पू थापक के मकान से रेलवे स्टेशन की ओर , ऐतहार )
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2019-2020 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/4/2019 Work start date : 30/6/2019
Present status : No Road Proposed Status : Constr of Cement Concrete Roads for Comm
Tech Sanction Details
Technical Sanction No. : 03/19-20 TS Sanction Date : 23/6/2019
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
102000 0 0 0 578000 0 0 578000 0 680000
Financial Sanction Details
Financial\Administrative Sanction No: 04/19-20 A Financial\Administrative Sanction Date 29/6/2019
Fin. Sanc. Amt. (in Rs) NREGA:102000 Panchparmeshwar
578000
Scheme 2
0
Scheme 3
0
Total
680000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Dag-beling-Single spade stroke minimum 75mm deep8150.5407.5
2Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete.128.64638.882175.232
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal)137.123194.2437988.704
4False work for R.C.C. and P.C.C. work in plinth and foundation193.78132.525675.85
5Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide)319.876.32015.181
6Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 30 Kms. and part there of upto 50 Kms.107.84673.172587.104
7Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.14500045000
8Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work78.9888.46981.832
9Field Technical Supervisior Charge-FTSC171007100
Total Activity 680000
S.NoMaterialQuantityUnit PriceTotal
1Convergence Amount1578000578000
Total Material 578000