S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Site clearance, cutting grass, raking into heaps and removing off the premises | 320 | 0.405 | 129.6 |
2 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 480 | 7.04 | 3379.2 |
3 | Cutting down trees (exceeding 30cm girth, grubbing uproot, filling pits and levelling off ground, lopping branches, trimming, removing not exceeding 50meter & staking serviceable material and cleaning site.-Girth exceeding 150 cm and not exceeding 200 cm | 144 | 46.68 | 6721.92 |
4 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil | 384 | 156.79 | 60207.36 |
5 | Extra for under-ramming inside the bore holes for under reamed piles.-200mm | 2732.88 | 144 | 393534.72 |
6 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m | 14.4 | 1414.65 | 20370.96 |
7 | Stone shelves fixed in walls in cement mortar 1:3 (1cement, 3sand) I/c finishing complete.-40 mm thick | 23.27 | 234.04 | 5446.1108 |
8 | Providing and fixing 20mm thick single leaf battened door and window shutters with necessary ledges and braces (25mm) including bright finished or/and black enamelled M.S. butt hinges with necessary screws.-Sal wood | 10.08 | 3947 | 39785.76 |
9 | Pointing on CR masonry with cement mortar 1:3 (1cement, 3 sand)-Ruled pointing | 44.8 | 174.2 | 7804.16 |
10 | Painting with enamel paint, brushing, interior to give an even shade I/n cleaning the surface of all dirt dust and other foreign matter on steel and other metal surfaces.-1 coats | 320 | 112.71 | 36067.2 |
11 | contingency | 32000 | 1 | 32000 |
12 | All maintainance of plants after transplanting work inclusive of Irrigation, Interculture operation, spray of pesticides, thala preparation, earthing up etc. with securty for second year per 675 plants. | 66.248 | 226.38 | 14997.22224 |