S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Contingency | 1 | 16403.03 | 16403.03 |
2 | Labour only for item no.1279 | 600 | 151.7 | 91020 |
3 | Collection of rubble masonry (size 0.014cum to 0.06cum) other then black trap, basalt or granite. | 90 | 475.3 | 42777 |
4 | Stacking without boxing.-Puddle earth, moorum, sand or kankar | 184.5 | 10.5 | 1937.25 |
5 | Stacking without boxing.-Masonry stones, pitching stones or boulders | 90 | 27.1 | 2439 |
6 | Transportation rates for Masonry stone. | 90 | 539.84 | 48585.6 |
7 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 184.5 | 228.96 | 42243.12 |
8 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. | 252 | 81.2 | 20462.4 |
9 | Collection of hard moorum including stacking at quarry. | 184.5 | 130.8 | 24132.6 |