Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Jun-2024 06:38:55 PM 
Back  
State: MADHYA PRADESH District: DAMOH Block: JABERA Panchayat: GUDA
Work Code: 1711006047/IF/22012035078390 (kapil dhara koop nirman munna rajak / moti rajak )
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2023-2024 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 14/4/2023 Work start date : 20/4/2023
Present status : Not Exist Proposed Status : Constr of Berkeley Compost Pit for Individual
Tech Sanction Details
Technical Sanction No. : 1711006/2023-2024/36580/TS Sanction Date : 15/5/2023
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
105274.91 64363.38 53852.27 8737.47 0 0 0 127000 0 232228.03
Financial Sanction Details
Financial\Administrative Sanction No: 1711006/2023-2024/36580/AS Financial\Administrative Sanction Date 15/5/2023
Fin. Sanc. Amt. (in Rs) NREGA:232228 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
233000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m53.3667.00749625187413575.52
2Providing and laying in foundation, plinth and under floors cement concrete with 20mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work ( if 20 mm metal is used in place of 40mm metal in item number 04.13 & 04.15) (a) C.C. 1:2:4 (1cement, 2sand, 4metal)0.2944408.231292517011296.02
3Centering and shuttering including strutting , propping etc. and removal of form work for P.C.C. work in foundation, footing, bases for column5.071182.281601262079924.35
4(e) In Cement mortar 1:6 (1cement, 6sand)20.713022.0941574118862587.57
5(j) 5.0 Km. Lead6.879192.8855938363131326.86
6(X) 5.0 Km. Lead23.337262.1738012598026118.35
7(X) 5.0 Km. Lead9215.3566666666671938.21
8(X) 5.0 Km. Lead9168.541516.86
9(XV) 10 Km. Lead12.23238.3417825020442914.92
10(XV) 10 Km. Lead0.096238.33333333333322.88
11(b) Dense or hard soil60.235173.06283722088510424.44
12(I)1.50 m. to 2.00 m.20.178234.5029239766084731.8
13(II)2.00 m. to 2.50 m.20.178246.2161760333044968.15
14(III)2.50 m. to 3.00 m.20.178584.04301714738811784.82
15(X)6.00 m. to 6.50 m.8.67978.3206459054218482.04
16(XI)6.50 m. to 7.00 m.8.67999.4475201845448665.21
17(XII)7.00 m. to 7.50 m.8.3051020.575556893448475.88
18(XIII)7.50 m. to 8.00 m.8.3051041.703792895858651.35
19(XIV)8.00 m. to 8.50 m.7.9481062.830900855568447.38
20(XV)8.50 m. to 9.00 m.7.9481083.958228485158615.3
21(XVI)9.00 m. to 9.50 m.7.5991105.086195552058397.55
22(IV)3.00 m. to 3.50 m.9.813870.2292876796098539.56
23(V)3.50 m. to 4.00 m.9.813887.6215224701938710.23
24(VI)4.00 m. to 4.50 m.9.424905.0148556876068528.86
25(VII)4.50 m. to 5.00 m.9.424922.4076825127348692.77
26(VIII)5.00 m. to 5.50 m.9.043939.799845184128498.61
27(IX)5.50 m. to 6.00 m.9.043957.1923034391248655.89
28Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders.9187.2977777777781685.68
29Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point.9261.2177777777782350.96
Total Activity 230000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper0.567861000567.86
20084-Hire charges of Diesel truck - 9 tonne (without POL)2.7774899721005832.728937
30297-Stone Aggregate(single size): 10 mm nominal size0.0323465021.021
40325-Blasting powder73.19121564098.70776
50326-Blasting fuse (fuse wire)79.8035282234.498
60367-Portland Cement2.0220145640012940.8928
70982-Coarse sand (zone III)0.9247015979.2905.4677088
80983-Fine sand (zone IV)7.44500110257631.126025
91157-Stone for masonry work24.023649511891.682
101235-Diesel oil34.89883581003489.88358
113-Display Board / CIB127002700
125001-Mobil oil1.23645382270333.8425314
13MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT1.2788425500639.42125
14MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)0.689748790544.90092
15MR6091-WOOD-Kail wood 2nd class0.0181107118000325.99278
Total Material 54200