State: MADHYA PRADESH District: KHANDWA Block: BALADI Panchayat: MALUD
Work Code: 1725001028/RC/22012034177204 (सी सी रोड निर्माण कार्य ज्ञानसिंह धन्‍ना के मकान स)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 26/4/2013 Work start date : 1/7/2013
Present status : Earthern road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 000055/13 Sanction Date : 2/7/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
96000 63000 0 0 236000 0 0 299000 0 395000
Financial Sanction Details
Financial\Administrative Sanction No: 000001/13 Financial\Administrative Sanction Date 3/7/2013
Fin. Sanc. Amt. (in Rs) NREGA:159000 Panchparmeshwar
236000
Scheme 2
0
Scheme 3
0
Total
395000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Dag-beling-Single spade stroke minimum 75mm deep3000.5150
2Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)82.553478.5287150.175
3False work for R.C.C. and P.C.C. work in plinth and foundation224.2154.234571.64
4Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide)2946.31852.2
5Labour only for item No. 0801.64.261268096.76
6Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 64.266385.56
7Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 82.55322641.6
8Transportation of metal 18.16193.053505.788
9Transportation of metal 70.17214.515051.465
10Transportation of metal 35.5193.056853.275
11Transportation of metal 64.26107.646916.9464
12Site clearance, cutting grass, raking into heaps and removing off the premises61.297.75979.24
13Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Disintegrated or soft rock (not requiring blasting) for Tank Work214.9497.720999.638
Total Activity 395000
S.NoMaterialQuantityUnit PriceTotal
120 MM B.T.METAL6395059850
2CEMENT(BEGS)510300153000
3Centering and Shuttering1607512000
4Display board120002000
5mixer machin (perday)610006000
6murrom641509600
7PhotoCopy & Stationary110501050
8SAND40110044000
9Transportation charges130003000
10Vibrator (Per Day)151001500
11Water With Tenkar107007000
Total Material 299000