S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Site clearance, cutting grass, raking into heaps and removing off the premises | 1775 | 1.8 | 3195 |
2 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 1 | 3000 | 3000 |
3 | Dag-beling-Double spade "v" shaped stroke 100mm deep | 710 | 0.5 | 355 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 53.25 | 2384.8 | 126990.6 |
5 | Providing and laying damp proof course 50mm thick with C.C.1:2:4 with 20mm size graded stone aggregate. including curing. | 319.5 | 196.6 | 62813.7 |
6 | Random / uncoursed rubble masonry in plinth and foundation with mud mortar including levelling at plinth level. | 159.75 | 983.7 | 157146.075 |
7 | Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Raised and cut pointing | 390.5 | 113.8 | 44438.9 |
8 | Collection of hard metal other then black trap basalt and granite for building work (without blasting) .-40 mm nominal size | 13.65 | 355.8 | 4856.67 |
9 | Stacking without boxing.-Puddle earth, moorum, sand or kankar | 18.9 | 108.3 | 2046.87 |
10 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Loose or soft soil | 45 | 556.9 | 25060.5 |
11 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil | 346.13 | 95 | 32882.35 |
12 | contingency | 1 | 29000 | 29000 |
13 | Transportation of water mannually with in one km. distance for irrigation of hundred plants. | 1 | 32332.8 | 32332.8 |