State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: DEWAS
Work Code: 1713004012/RC/22012034319509 (Ts no.1363 Sudur Gram Sampark Mukhya Marg se Purwa Basti Pahuc Marg)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2016-2017 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 2/10/2016 Work start date : 3/1/2017
Present status : No Road Proposed Status : Bitumen Top
Tech Sanction Details
Technical Sanction No. : 1363/10/12 Sanction Date : 29/11/2016
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
403000 697000 0 0 0 0 0 697000 0 1100000
Financial Sanction Details
Financial\Administrative Sanction No: 19/10/12 Financial\Administrative Sanction Date 15/12/2016
Fin. Sanc. Amt. (in Rs) NREGA:1100000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1100000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard000
2Site clearance, cutting grass, raking into heaps and removing off the premises80001.814400
3Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil11600016000
4Dag-beling-Single spade stroke minimum 75mm deep30000.3900
5Collection of approved soil having CBR not less then 12, including stacking at quarry.35052.718445
6Transportation of metal 2136148.02316170.72
7Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-300mm dia2.51537.5
8Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making117021.625272
9Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor213623.149341.6
10Compaction of hard shoulder collected at site, i/c making 4-5% camber by tractor mounted grader or labourers, watering at OMC and compacting with 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7)35040.114035
11Construction of gravel base course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more to bring the material in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clau540.75626.9338996.175
12Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clause 2.2.3 of IRC:SP:154.5558.686303.7
13Collection of puddle earth including stacking at quarry2136102.7219367.2
Total Activity 1100000
S.NoMaterialQuantityUnit PriceTotal
1Compaction of Earth Work14500045000
2Compaction of GSB14000040000
3Compaction of Selected soil14500045000
4contangency and work charges14300043000
5Earth Work in Exacavation12500025000
6Gravel or moorum1205000205000
7Hard Murum Traspotesan14500045000
8HumePipes16000060000
9rolling and consolidation of s16600066000
10soil transportation15000050000
11Steel Board125002500
12Transportation charges11000010000
13Water Saplay11700017000
14बजरी14300043000
Total Material 697000