S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 1500 | 1500 |
2 | Dag-beling-Single spade stroke minimum 75mm deep | 142 | 0.3 | 42.6 |
3 | Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead | 425 | 118 | 50150 |
4 | Transportation of metal | 131.62 | 105.66 | 13906.9692 |
5 | Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN | 58.5 | 69.1 | 4042.35 |
6 | Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making | 526.5 | 21.6 | 11372.4 |
7 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. -Loose or soft soil for Road Work | 640 | 87.3 | 55872 |
8 | Surface dressing of ground, including removing vegetation, and/ or unequalities not exceeding 15cm deep and disposal of rubbish lead upto 20m And lift upto1.5m-Loose or soft soil. | 3270 | 5.1 | 16677 |
9 | Collection of hard moorum including stacking at quarry. | 78.5 | 334.92 | 26291.22 |