S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Site clearance, cutting grass, raking into heaps and removing off the premises | 2025 | 3.5 | 7087.5 |
2 | 22cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014 | 154.3 | 293 | 45209.9 |
3 | Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making | 990.18 | 45.2 | 44756.136 |
4 | FOR EARTHEN DAM - Puddle filling of good clay including lead upto 50m including mixing watering and kneeding by tamping ramming and laying etc. | 201.6 | 561.6 | 113218.56 |
5 | Labour only for item 2308 | 129.6 | 52.7 | 6829.92 |
6 | Lossening of hard soil by ploughing the existing gound | 1980.37 | 183.16 | 362724.5692 |
7 | Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed | 1 | 20000 | 20000 |