Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Sep-2024 04:11:25 PM 
Back  
State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: PUR
Work Code: 1702001029/RC/22012034226346 (gsb road Gorakhan house to pokhara)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2014-2015 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : Yes
Proposal Date : 27/5/2014 Work start date : 1/8/2014
Present status : No Road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 7785 Sanction Date : 25/6/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
553800 270400 0 0 0 0 0 271000 0 824200
Financial Sanction Details
Financial\Administrative Sanction No: 45/7785 Financial\Administrative Sanction Date 4/7/2014
Fin. Sanc. Amt. (in Rs) NREGA:824200 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
825000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard125002500
2Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.63004.125830
3Chain and compass survey.-Canals/Roads0.7584408.8
4Fly levelling for fixing temporary bench marks.-Above 15 m interval0.7438306.6
5Levelling - Headwork.-Below 5 m interval0.714601022
6Levelling - Headwork.-Above 15 m interval0.7467326.9
7Stacking and boxing.-Moorum or sand420156300
8Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.1218000218000
9Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.4204117220
10Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN42059.725074
11Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making1676.32520.734699.9275
12Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor2090.922.146208.89
13Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work384181.2311889.2
14Collection of hard moorum including stacking at quarry.420130.854936
15contingency14122041220
16Labour difference in case of old SoR13880038800
Total Activity 825000
S.NoMaterialQuantityUnit PriceTotal
1Compaction of Earth Work1676.3320.734700.031
2Compaction of GSB42059.725074
3Compaction of Selected soil2090.922.146208.89
4contangency and work charges12500025000
5Kilometre Stone (200 M)43341336
6Kilometre Stone (ordinary)46872748
7Transportation charges1130000130000
8बोर्ड150005000
Total Material 271000