S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 837.5 | 6.54194626865672 | 5478.88 |
2 | (a) Other then black trap Basalt or granite | 74 | 298.858378378378 | 22115.52 |
3 | (a) Consolidation of Moorum /earth work (rate for 1Cum. of Moorum /earth work) | 706.9 | 2.35125194511246 | 1662.1 |
4 | (XI) 6 Km. Lead | 74 | 261.068783783784 | 19319.09 |
5 | (VI) 3.0 Km. Lead | 153.9 | 194.898895386615 | 29994.94 |
6 | (XIV) 9 Km. Lead | 378 | 199.264126984127 | 75321.84 |
7 | (XXV) 30 Km. Lead | 175 | 366.695028571429 | 64171.63 |
8 | (a) Boulders | 118.8 | 570.825168350168 | 67814.03 |
9 | For earthen dam - puddle filling of good clay including lead upto 20 meter including mixing, watering & kneading by tamping , ramming & laying etc. | 153.9 | 421.809096816114 | 64916.42 |
10 | Hearting, casing/cut off filling soil etc.
At optimum moisture content to achieve maximum dry density by mechanical sheep foot roller/ vibratory compacters including watering, required leads and lifts and material etc. complete. | 706.9 | 21.7465412363842 | 15372.63 |
11 | a (iii) Loose or soft soil for Tank Work | 41.45 | 99.3942098914354 | 4119.89 |
12 | b (iii) Dense or hard soil for Tank Work | 175 | 134.187485714286 | 23482.81 |
13 | c (iii) Hard moorum for Tank Work | 414 | 178.737753623188 | 73997.43 |
14 | a (i) Disintegrated or soft rock (not requiring blasting) for Tank Work | 48.2 | 568.889211618257 | 27420.46 |