State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: KHAIRA
Work Code: 1713004014/RS/28506 (मर्यादा अभियान अंतर्गत शौचालय निर्माण लालजी शुक्‍ल)
Work Category: Rural Sanitation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2012-2013 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/8/2012 Work start date : 1/6/2013
Present status : Not Exist Proposed Status : Individual Household Latrines
Tech Sanction Details
Technical Sanction No. : 100/14/7 Sanction Date : 14/8/2012
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Beneficiary Contribution Maryada scheme3 Total
2775 1625 0 0 0 5500 0 7200 0 9900
Financial Sanction Details
Financial\Administrative Sanction No: 20/14 Financial\Administrative Sanction Date 26/1/2013
Fin. Sanc. Amt. (in Rs) NREGA:4400 Beneficiary Contribution
0
Maryada
5500
Scheme 3
0
Total
9900
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)0.4341642.3712.7582
2Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:6 (1cement, 6sand)1.0882179.32371.0784
3Add extra for brick masonry in square or rectangular pillars.0.2881898.9546.8832
4Half brick masonry in class 25 open bhatta or pajawa burnt brick in super structure including placing of 6mm iron bar at every 3rd layer of brick.-In cement mortar 1:47.26258.71878.162
5Honey comb brick masonry with class 25 open bhatta or pajawa burnt brick 10cm Thick.-In cement mortar 1:48.289136.51131.4485
6Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height103.434
715mm thick cement plaster on rough side of wall in-Cement mortar 1:6 (1cement, 6sand)3.7873.1276.318
8Providing 6mm thick corrugated asbestos cement sheets roofing fixed with galvanised iron J or L hooks bolts and nuts 8mm dia. G.I. plain and bitumen washer complete excluding the cost of purlines rafters and trusses.2.08318661.44
9Providing and fixing cut stone slab (chisel dressed) for roofs including flush pointing of the bottom in C.M. 1:3 (1cement, 3sand) and filling the joints in C.M. 1:4 (1cement, 4sand) including fixing in chased grooves in walls, curing etc. complete.0.1137138.2806.6166
10Cement concrete flooring 1:2:4 (1cement, 2sand, 4graded stone aggregate, 20mm nominal size) laid in one layer and finished with floating coat of neat cement.-40 mm thick.1.26151.3190.638
11White washing whith lime on undecorated wall surfaces (two coats) to give an even shade including thoroughly broomed the surface to remove all dirt, dust, mortar drops and other foreign matter.185.599
12Providing and fixing water closet squatting pan (Indian type W.G. pan) size 580mm (earth work bed concrete, foot rests and trap to be measured and paid for separately)-Vitreous China Orissa pattern - white colour1508.6508.6
13Providing and fixing 100mm size P or S trap for water closet squatting pan including jointing the trap with pan and soil pipe in cement mortar 1:1 (1cement, 1fine sand)-Vitreous china1187.239187.239
14Providing and fixing on Wall face Asbestos Cement building pipe of the following nominal size including jointing with sun yarn soaked in bitumen and cement mortar 1:2 (1cement, 2sand) complete .-80 mm dia.3.487.8298.52
15Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work2.9167.8197.298
Total Activity 9900
S.NoMaterialQuantityUnit PriceTotal
1Cement116251625
2complete material cost for NBA155005500
3कारीगर000
Total Material 7200