S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 2500 | 2500 |
2 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 2700 | 4.1 | 11070 |
3 | Filling foundation and around masonry work with moorum I/c ramming layers and watering. | 37.5 | 145.4 | 5452.5 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 4.87 | 2199.9 | 10713.513 |
5 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2.5:5 (1cement, 2.5 sand, 5metal) | 28.92 | 2508.7 | 72551.604 |
6 | False work for R.C.C. and P.C.C. work in plinth and foundation | 85 | 127.3 | 10820.5 |
7 | Chain and compass survey.-Canals/Roads | 0.3 | 584 | 175.2 |
8 | Fly levelling for fixing temporary bench marks.-Above 15 m interval | 0.3 | 438 | 131.4 |
9 | Levelling - Headwork.-Below 5 m interval | 0.3 | 1460 | 438 |
10 | Levelling - Headwork.-Above 15 m interval | 0.3 | 467 | 140.1 |
11 | Stacking and boxing.-Moorum or sand | 180 | 15 | 2700 |
12 | Transportation of 20 MM metal | 29.83 | 686.2 | 20469.346 |
13 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 1 | 54000 | 54000 |
14 | Transportation rates for Hume pipes (NP-3) 1000 mm to 1200 mm dia. | 7.5 | 582.68 | 4370.1 |
15 | Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing. | 180 | 80.5 | 14490 |
16 | Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN | 180 | 59.7 | 10746 |
17 | Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-900 mm dia. | 7.5 | 3684.1 | 27630.75 |
18 | Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making | 718 | 20.7 | 14862.6 |
19 | Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor | 896 | 22.1 | 19801.6 |
20 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work | 1646 | 81.2 | 133655.2 |
21 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Loose or soft soil | 28.33 | 88.33 | 2502.3889 |
22 | Collection of hard moorum including stacking at quarry. | 180 | 130.8 | 23544 |
23 | contingency | 1 | 26000 | 26000 |