State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: DEVRIKALA(P)
Work Code: 1703004033/RS/22012034327733 (NALI NIRMAN HARNANDAN KE KHALIYAN SE KASAI BABA KI OR)
Work Category: Rural Sanitation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2016-2017 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 2/10/2016 Work start date : 26/2/2017
Present status : Not Exist Proposed Status : Drainage Channel
Tech Sanction Details
Technical Sanction No. : 33/4942 Sanction Date : 25/1/2017
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
61854 97146 0 0 0 0 0 97200 0 159000
Financial Sanction Details
Financial\Administrative Sanction No: 33/81 Financial\Administrative Sanction Date 27/1/2017
Fin. Sanc. Amt. (in Rs) NREGA:159000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
159000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)7.093307.423449.466
2Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal)9.452202.320811.735
3False work for R.C.C. and P.C.C. work in plinth and foundation21147.83103.8
4Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:8 (1cement, 8sand)31.52082.165586.15
5Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Raised and cut pointing84127.610718.4
6Transportation of 20 MM metal6.03596.73598.101
7Transportation of sand4.33184.23797.7159
8Transportation rates for Masonry stone.31.5404.1812731.67
9Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock.8.694183.71597.0878
10Transportation rates for Lime (fat), Hydraulic or any other.3849.1313849.13
11Loading & stacking of cement from the-Railway godown in to truck, dumper7849.1317849.13
12Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil75.652.73984.12
Total Activity 159000
S.NoMaterialQuantityUnit PriceTotal
120mm metal6.02651521.79170.52505
2Contengency19509.269509.26
3Display board140004000
4PhotoCopy & Stationary100101000
5Photograph110001000
6SANT20.818847.5617644.50408
7Transpotation Charges44.524404.1817995.71032
8सीमेन्‍ट12529536875
Total Material 97200