Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 28-Jun-2024 07:54:56 PM 
Back  
State: MADHYA PRADESH District: DHAR Block: BADNAWAR Panchayat: Dotriya
Work Code: 1722001010/WC/22012035138720 (परकोलेशन तालाब पुना बिंदु के खेत के पास)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2023-2024 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 2/10/2023 Work start date : 4/10/2023
Present status : Non-existent Proposed Status : Construction of Embankment for community
Tech Sanction Details
Technical Sanction No. : 1722001/2023-2024/200113/TS Sanction Date : 4/10/2023
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
916240.29 570590.73 7891.76 0 0 0 0 579000 0 1494722.78
Financial Sanction Details
Financial\Administrative Sanction No: 1722001/2023-2024/200113/AS Financial\Administrative Sanction Date 4/10/2023
Fin. Sanc. Amt. (in Rs) NREGA:1494722 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1495000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1(I) 1.50 m. to 3.00 m.941.7611.357192915392510695.75
2(III) 4.50 m to 6.00 m2101.1929.834998262889162689
322cm thick dry stone picked up boulder pitching i/c picking of boulder with individual size of 22cm depth.599.08250.351505641984149980.58
4(X) 5.0 Km. Lead1410.66168.540257751691237753
5(III) 1.5 Km. Lead2101.19110.846234752688232909
6Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making 4% camber and required Grade by tractor mounted grader or labourers, watering at OMC and compacted by 80 to 100 kN static weight rollers to achieve desired density minimum 97% as per table 300.1 and 300.2 of (MORD) - i/c required leads and lifts of materials etc. complete.3042.9520.385201860037162031.15
7For earthen dam - puddle filling of good clay including lead upto 20 meter including mixing, watering & kneading by tamping , ramming & laying etc.468.9490.630603540201230056.69
8Site clearance, cutting grass, raking into heaps and removing off the premises1874.753.053820509401255725.15
9c (iii) Hard moorum for Tank Work50.04207.90027977617910403.33
10a (i) Disintegrated or soft rock (not requiring blasting) for Tank Work283.55655.525445247752185874.24
11Loosing of hard soIl such as moorum etc. By ploughing (tractor ect.) the existing ground exceeding 30cm in depth as well as 10 sqm on plan including all running expanses of machine.3326.853.0510001953800110150.22
12Spreading dressing, breaking of clods of ploughed earth upto 20m lead and lift upto 1.5m disposed soil to be leveled and neatly dressed.3326.8585.68860633933285073.14
Total Activity 1484000
S.NoMaterialQuantityUnit PriceTotal
10038-Tractor with ripper attachment4.1688415252010505.48058
20055-Smooth Wheeled Roller 8 to 10 tonne38.03687530011411.0625
30057-Water Tanker 5 to 6 KL Capacity60.8591207303.08
40084-Hire charges of Diesel truck - 9 tonne (without POL)104.771981962100220021.162116
51235-Diesel oil860.6742006110086067.420061
63-Display Board / CIB15381.25381.2
75001-Mobil oil30.665947762708279.8058952
87753-Boulder 50 mm to 200 mm179.72440773147.668
98-BFT/TA/Mate160006000
10MR6039-Water3651540.0621909.24
11MR6089-Hire Charges for tractor with ploughing arrangement including running expanses and driver14.9708256008982.495
Total Material 460000