Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Sep-2024 10:17:15 AM 
Back  
State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: AITHAAR
Work Code: 1702001027/RC/22012034220556 (Panuch marg pawai road se pujari ke kua tak bhag )
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2014-2015 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 14/4/2014 Work start date : 1/6/2014
Present status : No Road Proposed Status : Kankar Road
Tech Sanction Details
Technical Sanction No. : 7397/27 Sanction Date : 21/5/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
72000 28000 0 0 0 0 0 28000 0 100000
Financial Sanction Details
Financial\Administrative Sanction No: 2/-1027 Financial\Administrative Sanction Date 26/5/2014
Fin. Sanc. Amt. (in Rs) NREGA:100000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
100000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard125002500
2Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.9004.13690
3Chain and compass survey.-Canals/Roads0.158458.4
4Fly levelling for fixing temporary bench marks.-Above 15 m interval0.143843.8
5Levelling - Headwork.-Below 5 m interval0.11460146
6Levelling - Headwork.-Above 15 m interval0.146746.7
7Stacking and boxing.-Moorum or sand6015900
8Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.11860018600
9Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.60412460
10Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN6059.73582
11Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making239.47520.74957.1325
12Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor298.722.16601.27
13Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work548.8481.244565.808
14Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Loose or soft soil000
15Collection of hard moorum including stacking at quarry.60130.87848
16contingency140004000
Total Activity 100000
S.NoMaterialQuantityUnit PriceTotal
1compaction of embankment with 23920.74947.3
2Sand for filling and road blin120002000
3signboard125002500
4Transpotation Charges11800018000
5बजरी1500500
Total Material 28000