State: MADHYA PRADESH District: NARSINGHPUR Block: BABAI CHICHLI Panchayat: BARHA BADA
Work Code: 1734004056/RS/22012034694041 (सी सी नाली निर्माण कार्य बजरंगी अहिरवार के मकान से रमेश वंशकार के मकान की ओर चौकी मोहल्ला )
Work Category: Rural Sanitation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2023-2024 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 2/4/2023 Work start date : 20/4/2023
Present status : Not Exist Proposed Status : Constr of Open/Covered Grey Water Drain for Comm
Tech Sanction Details
Technical Sanction No. : 03 RS Sanction Date : 3/4/2023
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost 15th Finance Commission scheme2 scheme3 Total
123000 0 0 0 1000 0 0 1000 0 124000
Financial Sanction Details
Financial\Administrative Sanction No: 01 RS Financial\Administrative Sanction Date 19/4/2023
Fin. Sanc. Amt. (in Rs) NREGA:123000 15th Finance Commission
1000
Scheme 2
0
Scheme 3
0
Total
124000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises000
2Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil220191.7942193.8
3Providing and laying in foundation, plinth and under floors lime concrete with 40mm nominal size graded stone aggregates (metal) and 40% lime mortar. i/c ramming in layers and curing complete excluding cost of form work.-Lime mortar 1:2 (1lime putty, 2sand)20.933202.6367031.0459
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2.5:5 (1cement, 2.5 sand, 5metal)06243.260
5False work for R.C.C. and P.C.C. work in plinth and foundation0174.20
6Steel work in single section including in cutting, hoisting fixing in position in R.S. joists, channels, angles, tee.191100
7Coal tarring 2 coats on new wood and wood based surface .136453645
8Transportation of metal 60.500
9Transportation of sand14293.594110.26
10Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.30.5213.96523.95
Total Activity 124000
S.NoMaterialQuantityUnit PriceTotal
18 mm -  M.S. rod069.580
2CEMENT (Beg)03500
3Centering and Shuttering0200
4Contengency01380000
5Display board110001000
6Metal 20 mm010000
7SAND012000
8Transportation charges0798.260
Total Material 1000