S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Contingency | 1 | 31000 | 31000 |
2 | Dag-beling-Double spade "v" shaped stroke 100mm deep | 3300 | 0.4 | 1320 |
3 | Transportation of metal | 180 | 322 | 57960 |
4 | Transportation of metal | 1925.5 | 82.053 | 157993.0515 |
5 | Korebandi for consolidation work.-30cm wide and 10cm thick. | 2200 | 1.9 | 4180 |
6 | Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN | 495 | 64.2 | 31779 |
7 | Providing single coat surface dressing with paving bitumen using 18kg. of bitumen 80/100 per 10 sqm with 0.15cum of stone chipping 13.2mm nominal size per 10 sqm of road surface for second coat and rolling complete with power roller exceeding 8 tonne. | 30 | 772.4 | 23172 |
8 | Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor | 6025.3 | 18.8 | 113275.64 |
9 | Site clearance, cutting grass, raking into heaps and removing off the premises | 11000 | 1.4 | 15400 |
10 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. -Loose or soft soil for Road Work | 5857.5 | 67.8 | 397138.5 |
11 | Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Loose or soft soil. | 13301 | 10.7 | 142320.7 |
12 | Labour difference in case of old SoR | 200 | 122 | 24400 |