Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Jun-2024 06:18:53 PM 
Back  
State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: PARASI
Work Code: 1713004066/WC/22012034650557 (water harwasting samudyik bhawan m)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2021-2022 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/4/2021 Work start date : 10/4/2021
Present status : Existing Proposed Status : Construction of Community Water Harvesting Ponds
Tech Sanction Details
Technical Sanction No. : 1713004/2021-2022/157818/TS Sanction Date : 14/6/2021
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
12150.96 13367.68 410.1 575.09 0 0 0 14400 0 26503.83
Financial Sanction Details
Financial\Administrative Sanction No: 1713004/2021-2022/157818/AS Financial\Administrative Sanction Date 15/6/2021
Fin. Sanc. Amt. (in Rs) NREGA:26792 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
26800
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m2758.51777777777781579.98
2(i) Cement mortar 1:5 (1cement, 5sand)2.123953.155660377368380.69
3(h) 4.0 Km. Lead9159.7511111111111437.76
4(VI) 3.0 Km. Lead9160.8777777777781447.9
5(VI) 3.0 Km. Lead9125.9044444444441133.14
6(b) Dense or hard soil27148.3333333333334005
7Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders.9163.5677777777781472.11
8Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point.9228.1222222222222053.1
9Collection of River Borne Material (RBM) (any mixture of sand and graval ) i/c boxing and all leads and lifts up to loading point at quarry.9185.3766666666671668.39
10Citizen Information Board Size 0.9 Meter x 1.2 Meter ( Community Works )13613.853613.85
Total Activity 26800
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper0.032388528.5855
20084-Hire charges of Diesel truck - 9 tonne (without POL)0.944422422117.3448
30367-Portland Cement0.16695511919.7859
40368-White cement 0.0004157446.2976
50983-Fine sand (zone IV)0.52341076.25563.30925
61235-Diesel oil8.441268574.0016
75001-Mobil oil0.3028182.955.38212
87900-Modular common burnt clay bricks of class designation 7.51346.84.135562.284
9MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT0.06552534.125
10MR6032-Snowcem/ durocem0.00072778919.4523
11MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)0.02468216.368
Total Material 9900