State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: PARAYAYA
Work Code: 1702001059/AV/4121 (Aanganbadi/Other Rural Infrastructure,ATER)
Work Category: Anganvany
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 14/4/2015 Work start date : 7/12/2015
Present status : NEW Proposed Status : AWC
Tech Sanction Details
Technical Sanction No. : 104c Sanction Date : 11/8/2015
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
SK/SemiSK Est. Skilled Cost Est. Semi-Skilled Cost Women And Child Development scheme2 scheme3 Total
198000 132000 0 0 450000 0 0 582000 0 780000
Financial Sanction Details
Financial\Administrative Sanction No: 6649/104c Financial\Administrative Sanction Date 28/9/2015
Fin. Sanc. Amt. (in Rs) NREGA:330000 Women And Child Development
450000
Scheme 2
0
Scheme 3
0
Total
780000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard125002500
2Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m1535.8537
3Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering.10809.98099
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)6.352199.913969.365
5Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1.5:3 (1cement, 1.5sand, 3graded stone aggregate 20 mm nominal size)55.463460.2191902.692
6False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift188186.134986.8
7False work for R.C.C. and P.C.C. work in plinth and foundation65127.38274.5
8Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:6 (1cement, 6sand)212397.250341.2
9Half brick masonry in class 25 open bhatta or pajawa burnt brick in super structure including placing of 6mm iron bar at every 3rd layer of brick.-In cement mortar 1:425.3323.58184.55
10Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height32565.221190
11Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars280054.4152320
12Providing and fixing steel glazed doors, windows and ventilator of standard Rolled steel sections without horizontal glazing bars, joints mitred and welded with 16X3.15mm lugs 10cm long, embedded in cement concrete block 1:3:6 cement concrete with 20mm gr-Steel doors, windows side hung & ventilator top/ central hung.20.021162.323269.246
1310mm thick cement plaster on fair side of wall in-Cement mortar 1:5 (1cement, 5sand)23066.915387
1420mm thick cement plaster in two coat on rough side of wall in-Cement mortar 1:5 (1cement, 5sand)183.61137.625264.736
156mm cement plaster to Ceiling.-In Cement mortar 1:3 (1cement, 3sand)59.6279.14715.942
16Cement concrete flooring 1:2:4 (1cement, 2sand, 4graded stone aggregate, 20mm nominal size) laid in one layer and finished with floating coat of neat cement.-50 mm thick.56.25201.111311.875
17White glazed tiles 6mm thick in flooring, treads of steps and landings laid on a bed of 12mm thick cement mortar 1:3 finished with flush pointing in white cement.16.1363110178.03
18Kota stone slab flooring over 20mm thick base of C.M. 1:6 laid over and jointed with grey cement slurry mixed with pigment to match the shade of slab including grinding, rubbing & polishing etc. complete. (Area of each stone should not be less than 0.20 S-30 mm thick .1.02990.81010.616
19Oil bound distemper of approved quality of any shade two coats on new works including priming coat.51553.527552.5
20Painting with enamel paint, brushing, interior to give an even shade I/n cleaning the surface of all dirt dust and other foreign matter on steel and other metal surfaces.-3 coats3974.22893.8
21Transportation of metal 17500075000
22Fixing G.I pipe line, with all materials except pipe, fitting and clamps but including making good the walls and floors etc. complete (for item 2101)-25 mm dia.17.524.6430.5
23Providing and Fixing Brass Screw Down Bib Taps polished bright of the following nominal bore.-15mm dia.2111.4222.8
24Providing and fixing water closet squatting pan (Indian type W.G. pan) size 580mm (earth work bed concrete, foot rests and trap to be measured and paid for separately)-Vitreous China Orissa pattern - white colour1779779
25Providing and fixing 100mm size P or S trap for water closet squatting pan including jointing the trap with pan and soil pipe in cement mortar 1:1 (1cement, 1fine sand)-Glazed earthenware.2210.8421.6
26Providing and fixing wash basin with single hole for pillar tap with C.I. or M.S. brackets painted white including cutting holes and making good the same but excluding fitting.-Vitreous China Flat back wash basin 550 mm x 400 mm size in standard colour except Misty-Lilac11084.11084.1
27Field Technical Supervisior Charge-FTSC18800088000
Total Activity 780000
S.NoMaterialQuantityUnit PriceTotal
120 MM METAL15150022500
2BRICK5000630000
3CEMENT(BEGS)15029544250
4Convergence Amount1450000450000
5sand13520035200
Total Material 582000