S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m | 27 | 57.6081481481482 | 1555.42 |
2 | (j) 5.0 Km. Lead | 6.75 | 174.084444444444 | 1175.07 |
3 | (VI) 3.0 Km. Lead | 13.5 | 160.095555555556 | 2161.29 |
4 | (IV) 2.0 Km. Lead | 6.75 | 111.191111111111 | 750.54 |
5 | (b) Dense or hard soil | 27 | 146.027407407407 | 3942.74 |
6 | Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders. | 13.5 | 161.025185185185 | 2173.84 |
7 | Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point. | 6.75 | 224.576296296296 | 1515.89 |
8 | Collection of River Borne Material (RBM) (any mixture of sand and graval ) i/c boxing and all leads and lifts up to loading point at quarry. | 6.75 | 182.494814814815 | 1231.84 |