Work Code: 1713004041/RC/22012034337020 (टी यस 69 सुदूर ग्राम सम्पर्क सड़क निर्माण वीरेश सिंह परिहार के घर से अरुणप्रताप सिंह के खेत तरफ )
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2016-2017 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : No
Proposal Date : 17/2/2017 Work start date : 4/5/2017
Present status : No Road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 69/41 Sanction Date : 24/4/2017
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
429000 885000 0 0 0 0 0 885000 0 1314000
Financial Sanction Details
Financial\Administrative Sanction No: 01/41/ Financial\Administrative Sanction Date 3/5/2017
Fin. Sanc. Amt. (in Rs) NREGA:1314000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1314000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard110001000
2Site clearance, cutting grass, raking into heaps and removing off the premises1.81040018720
3Dag-beling-Single spade stroke minimum 75mm deep0.339001170
4Collection of approved soil having CBR not less than 5, including stacking at quarry.405.7652.721383.552
5Collection of approved soil having CBR not less then 12, including stacking at quarry.45552.723978.5
6Transportation of metal 2860112.41321492.6
7Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-300mm dia129812981
8Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor2860.123.166068.31
9Compaction of hard shoulder collected at site, i/c making 4-5% camber by tractor mounted grader or labourers, watering at OMC and compacting with 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7)45540.118245.5
10Construction of gravel base course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more to bring the material in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clau985.5832.5820428.75
11Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.164626462
12Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.1.29008.510810.2
13work charge110001000
Total Activity 1314000
S.NoMaterialQuantityUnit PriceTotal
16mm Chips85526.144718.5
2BGSY Information Board in Ceme120002000
3Board120002000
4Compaction of Earth Work152.9279.6542758.485
5Compaction of GSB53618.219760.56
6Compaction of Material226889.6201049.6
7Compaction of Selected soil114.1823.293927.12
8contangency and work charges59.9789.647297.04
9hard shoulder transportion85126.110718.5
10hume pipe154005400
11Loosening Machine Rent22.3147.33284.79
12loosing and compexion125.9278.935113.51
13Moorum47.5629.729910.75
14Transportanion of hard Muram79526.141561.9
15Transportanion of Soft Muram1285128.2164737
16Transportation of embankment s128563.2781301.95
17Transportation Of Material3563.272214.45
18Transportation of Water57318.2110434.33
19रोलर120.3472.256805.66
Total Material 885000