S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 1000 | 1000 |
2 | Site clearance, cutting grass, raking into heaps and removing off the premises | 1.8 | 10400 | 18720 |
3 | Dag-beling-Single spade stroke minimum 75mm deep | 0.3 | 3900 | 1170 |
4 | Collection of approved soil having CBR not less than 5, including stacking at quarry. | 405.76 | 52.7 | 21383.552 |
5 | Collection of approved soil having CBR not less then 12, including stacking at quarry. | 455 | 52.7 | 23978.5 |
6 | Transportation of metal | 2860 | 112.41 | 321492.6 |
7 | Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-300mm dia | 1 | 2981 | 2981 |
8 | Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor | 2860.1 | 23.1 | 66068.31 |
9 | Compaction of hard shoulder collected at site, i/c making 4-5% camber by tractor mounted grader or labourers, watering at OMC and compacting with 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7) | 455 | 40.1 | 18245.5 |
10 | Construction of gravel base course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more to bring the material in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clau | 985.5 | 832.5 | 820428.75 |
11 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. | 1 | 6462 | 6462 |
12 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. | 1.2 | 9008.5 | 10810.2 |
13 | work charge | 1 | 1000 | 1000 |