S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Site clearance, cutting grass, raking into heaps and removing off the premises | 495 | 1.8 | 891 |
2 | Dag-beling-Double spade "v" shaped stroke 100mm deep | 330 | 0.5 | 165 |
3 | Filling foundation and around masonry work with moorum I/c ramming layers and watering. | 231 | 211.4 | 48833.4 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal) | 18.56 | 882 | 16369.92 |
5 | Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:8 (1cement, 8sand) | 190.58 | 1858.7 | 354231.046 |
6 | Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height | 100 | 59.1 | 5910 |
7 | Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Ruled pointing | 544.5 | 127.6 | 69478.2 |
8 | Stacking without boxing.-Metal, single, stone chips or quarry spalls | 750 | 109.8 | 82350 |
9 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 1 | 244943.11 | 244943.11 |
10 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil | 92.81 | 96.2 | 8928.322 |
11 | SIGN BOARD | 1 | 5000 | 5000 |