Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Jun-2024 05:22:28 AM 
Back  
State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: PRATAPPURA
Work Code: 1702001079/RS/37111 (Maryada Mataprasad)
Work Category: Rural Sanitation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2012-2013 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 15/8/2012 Work start date : 24/6/2013
Present status : Not Exist Proposed Status : Individual Household Latrines
Tech Sanction Details
Technical Sanction No. : 156/05 Sanction Date : 27/9/2012
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Maryada scheme2 scheme3 Total
2700 1800 0 0 5500 0 0 7300 0 10000
Financial Sanction Details
Financial\Administrative Sanction No: 05/156 Financial\Administrative Sanction Date 23/1/2013
Fin. Sanc. Amt. (in Rs) NREGA:4500 Maryada
5500
Scheme 2
0
Scheme 3
0
Total
10000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Filling foundation and around masonry work with moorum I/c ramming layers and watering.0.5121.560.75
2Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:6 (1cement, 6sand)0.762287.81738.728
3Half brick masonry in class 25 open bhatta or pajawa burnt brick in super structure including placing of 6mm iron bar at every 3rd layer of brick.-In cement mortar 1:46.5312.82033.2
4Honey comb brick masonry with class 25 open bhatta or pajawa burnt brick 10cm Thick.-In cement mortar 1:47.6172.91314.04
5Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height18.6556.71057.455
615mm thick cement plaster on rough side of wall in-Cement mortar 1:4 (1cement, 4sand)4.3680.8352.288
7Providing 6mm thick corrugated asbestos cement sheets roofing fixed with galvanised iron J or L hooks bolts and nuts 8mm dia. G.I. plain and bitumen washer complete excluding the cost of purlines rafters and trusses.1.54319.9492.646
8Providing and fixing cut stone slab (chisel dressed) for roofs including flush pointing of the bottom in C.M. 1:3 (1cement, 3sand) and filling the joints in C.M. 1:4 (1cement, 4sand) including fixing in chased grooves in walls, curing etc. complete.0.117736.6851.026
9Cement concrete flooring 1:2:4 (1cement, 2sand, 4graded stone aggregate, 20mm nominal size) laid in one layer and finished with floating coat of neat cement.-40 mm thick.1.45148214.6
10White washing whith lime on undecorated wall surfaces (two coats) to give an even shade including thoroughly broomed the surface to remove all dirt, dust, mortar drops and other foreign matter.11.655.462.91
11Cutting out cracks of roof terrace to V-Section, cleaning out wetting, grouting with cement and sand slurry 1:3 (1 cement, 3 sand)0.321620.4518.528
12Providing and fixing water closet squatting pan (Indian type W.G. pan) size 580mm (earth work bed concrete, foot rests and trap to be measured and paid for separately)-Vitreous China Orissa pattern - white colour1492492
13Providing and fixing 100mm size P or S trap for water closet squatting pan including jointing the trap with pan and soil pipe in cement mortar 1:1 (1cement, 1fine sand)-Vitreous china1228.6228.6
14Providing and fixing on Wall face Asbestos Cement building pipe of the following nominal size including jointing with sun yarn soaked in bitumen and cement mortar 1:2 (1cement, 2sand) complete .-80 mm dia.371.8215.4
15Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil3.6473.8268.632
16labour only for leage pit and complete toilete structure well furnished000
Total Activity 10000
S.NoMaterialQuantityUnit PriceTotal
1Bricks3002600
2Cement43001200
3complete material cost for NBA155005500
Total Material 7300