State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: SYAU(P)
Work Code: 1703004084/RC/22012034343722 (Sudur Gram Sampark Sadak Syau se bajna ki or)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2017-2018 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 14/4/2017 Work start date : 7/7/2017
Present status : Earthern road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 84/203 Sanction Date : 21/6/2017
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
653186 705814 0 0 0 0 0 706000 0 1359000
Financial Sanction Details
Financial\Administrative Sanction No: 084/05 Financial\Administrative Sanction Date 26/6/2017
Fin. Sanc. Amt. (in Rs) NREGA:1359000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1359000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises72001.812960
2Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil15.6276.91201.178
3Dag-beling-Single spade stroke minimum 75mm deep24000.3720
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)1.9725044932.88
5Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2.5:5 (1cement, 2.5 sand, 5metal)16.852854.748101.695
6False work for R.C.C. and P.C.C. work in plinth and foundation50.37147.87444.686
7Fly levelling for fixing temporary bench marks.-Upto 15 m interval1.29541144.8
8Transportation of metal 3463.572.36250618.86
9Transportation rates for Masonry stone.163575712
10Transportation rates for Boulders, Laterite, rubble pitching stones and excavated hard rock.21019841580
11Providing and filling in foundation trenches and at the back of abutments, wing walls etc. and below pipe bed in layers not exceeding 15cm thick including watering and compacting including all lead and lifts.-Selected granular material in filling.1.81016.51829.7
12Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-300mm dia4531314085
13Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-1000 mm dia.63887.923327.4
14Construction of granular sub-base (GSB) by naturally occurred material or river born material or by crushed metal or mixture of two or more, to bring the material in appropriate grading mentioned in table 400.1, (I, II or III) of specifications for rural630576.9363447
15Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making674.262533.222385.515
16Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compact3463.538.4132998.4
17Construction of hard shoulder as per clause 407 of specifications for rural roads (MORD), with soil having CBR value not less than 12, inclusive of all leads and lifts, providing 4-5% camber by tractor mounted grader or labourers, watering at OMC and comp384268.4103065.6
18Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clause 2.2.3 of IRC:SP:180504.890864
19SIGN BOARD122222222
20Lossening of hard soil by ploughing the existing gound3463.552.7182526.45
21Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed793.2552.741804.275
22contingency11754.5611754.561
232507. KM Stone (A) With Rainforced CC (ii) Ordinary KM Stone211352270
242507. KM Stone (A) With Rainforced CC (ii) 200 M Stone63342004
Total Activity 1359000
S.NoMaterialQuantityUnit PriceTotal
110 mm -  M.S. rod15059.18865
22043 soil Compaction material3463.538.4132998.4
32048-Construction of gravel ba630350.07220544.1
42049-Construction of gravel su18027850040
520mm Chips10140014000
640 mm Metal202575140
7BAJARA140004000
8BGSY SIGN BOARD122222222
9Cement5030015000
10Compaction of Material674.26333.222385.5316
11construcation of hard shoulder384130.7750215.68
12hume pipe4531314085
13Kilometre Stone (200 M)63342004
14Kilometre Stone (ordinary)211352270
15Loosening Machine Rent793.252.72141.775
16mixer Mashin12631.70842631.7084
17Transportation Of Selected Soi3463.529.43101930.805
18Transpotation Charges202004000
19पानी टेकर58004000
20मुरम22019743340
21रोलर58004000
Total Material 706000