State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: PALAYCHHA(P)
Work Code: 1703004041/IF/9993693948 (PASHU SHED NIRMAN -RAMSINGH/HETRAM)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 14/4/2015 Work start date : 10/12/2015
Present status : Not Exist Proposed Status : Cattle Shed
Tech Sanction Details
Technical Sanction No. : 3182/41 Sanction Date : 20/11/2015
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
33474 27763 0 0 0 0 0 27800 0 61237
Financial Sanction Details
Financial\Administrative Sanction No: 201/41 Financial\Administrative Sanction Date 30/11/2015
Fin. Sanc. Amt. (in Rs) NREGA:61237 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
61300
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Contingency116201620
2Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil16.636951580.42
3Filling foundation and around masonry work with moorum I/c ramming layers and watering.6.0705156.3948.81915
4Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering.2.4168712104.336
5Providing and laying damp proof course 50mm thick with C.C.1:2:4 with 20mm size graded stone aggregate. including curing.26.695182.24863.829
6Random / uncoursed rubble masonry in plinth and foundation with mud mortar including levelling at plinth level.16.569983.716298.9253
7Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:8 (1cement, 8sand)10.05431721.517308.47745
8Pointing on CR masonry with cement mortar 1:4(1cement, 4sand)-Ruled pointing48.3464.43113.096
9Cement concrete flooring 1:2:4 (1cement, 2sand, 4graded stone aggregate, 20mm nominal size) laid in one layer and finished with floating coat of neat cement.-40 mm thick.000
10Second class brick flooring laid dry grouted with C.M. 1:6 i/c finishing the joints flush.21.681293.46361.2054
11Transportation of sand42.28166.4567037.75968
Total Activity 61300
S.NoMaterialQuantityUnit PriceTotal
120 M.M. B.T. METAL0.9913651351.35
240 M.M. METAL (cum)2.42136.9331.298
3Bricks1404560
4CEMENT (Beg)212705670
5Contangancy11200.71200.7
6MURROM6.86123843.78
7SAND4.98204018
8Stone cut Stone26.62517.9513787.829
Total Material 27800