S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Dag-beling-Double spade "v" shaped stroke 100mm deep | 450 | 0.8 | 360 |
2 | Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead | 95 | 148.8 | 14136 |
3 | Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete. | 83.2 | 537.3 | 44703.36 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 33 | 3975.9 | 131204.7 |
5 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 35 | 3562.8 | 124698 |
6 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used | 35 | 89.5 | 3132.5 |
7 | Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide) | 65 | 19.2 | 1248 |
8 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 1 | 70200 | 70200 |
9 | Construction of granular sub-base (GSB) by naturally occurred material or river born material or by crushed metal or mixture of two or more, to bring the material in appropriate grading mentioned in table 400.1, (I, II or III) of specifications for rural | 70 | 670 | 46900 |
10 | Providing and laying in trenches galvanised mild steel tubes (medium grade) of the following nominal bore, tube fittings (earth work in trenches to be measured and paid for separately)-80 mm dia. | 1 | 18764 | 18764 |
11 | Field Technical Supervisior Charge-FTSC | 1 | 9275 | 9275 |