S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 250 | 6.05992 | 1514.98 |
2 | (I) 1.50 m. to 3.00 m. | 1294.6 | 9.04463927081724 | 11709.19 |
3 | (X) 5.0 Km. Lead | 13.2 | 190.180303030303 | 2510.38 |
4 | b (iii) Dense or hard soil for Tank Work | 1309.18 | 124.299622664569 | 162730.58 |
5 | c (iii) Hard moorum for Tank Work | 950.23 | 165.567946707639 | 157327.63 |
6 | a (i) Disintegrated or soft rock (not requiring blasting) for Tank Work | 354.24 | 527.648966802168 | 186914.37 |
7 | 22cm thick dry stone pitching ( without quarry spalls ) with individual stone of 22 cm depth and minimum size 0.014 cum | 60 | 336.310666666667 | 20178.64 |