State: MADHYA PRADESH District: KHARGONE Block: BHAGVANPURA Panchayat: DHARMPURI
Work Code: 1724008022/IF/22012035073319 (kapil dhara kup nirman dasriya/daud)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2022-2023 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 26/1/2023 Work start date : 15/3/2023
Present status : Existing Proposed Status : Constr of Irrigation Open Well for Individuals
Tech Sanction Details
Technical Sanction No. : 1724008/2023-2024/80442/TS Sanction Date : 13/6/2023
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
102541.62 69002.16 61494.47 618.5 0 0 0 132000 0 233656.75
Financial Sanction Details
Financial\Administrative Sanction No: 1724008/2023-2024/80442/AS Financial\Administrative Sanction Date 15/6/2023
Fin. Sanc. Amt. (in Rs) NREGA:233836 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
234000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m30.867.00746753246752063.83
2(c) CC 1:2:4 (1 cement, 2 sand, 4 graded stone aggregate 20mm nominal size)6.1875689.6557297559435201.9
3(b) Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars330.52790.384476911114729874.51
4(b) Dense or hard soil46.73173.0629146158788087.23
5(I)1.50 m. to 2.00 m.15.678234.5031253986483676.54
6(II)2.00 m. to 2.50 m.15.678246.2163541268023860.18
7(XVIII)10.00 m. to 10.50 m.7.304878.5473713033956416.91
8(XIX)10.50 m. to 11.00 m.7.304905.6421139101866614.81
9(XX)11.00 m. to 11.50 m.7.257932.7366680446476768.87
10(XXI)11.50 m. to 12.00 m.7.257959.8318864544586965.5
11(X)6.00 m. to 6.50 m.8.67978.3206459054218482.04
12(XI)6.50 m. to 7.00 m.8.67999.4475201845448665.21
13(XII)7.00 m. to 7.50 m.8.3051020.575556893448475.88
14(XIII)7.50 m. to 8.00 m.8.3051041.703792895858651.35
15(XIV)8.00 m. to 8.50 m.7.9481062.830900855568447.38
16(XV)8.50 m. to 9.00 m.7.9481083.958228485158615.3
17(XVI)9.00 m. to 9.50 m.7.5991105.086195552058397.55
18(XVII)9.50 m. to 10.00 m.7.5991126.21397552318558.1
19(IV)3.00 m. to 3.50 m.9.875870.2288607594948593.51
20(V)3.50 m. to 4.00 m.9.813887.6215224701938710.23
21(VI)4.00 m. to 4.50 m.9.813905.014776317138880.91
22(VII)4.50 m. to 5.00 m.9.813922.4070111077149051.58
23(VIII)5.00 m. to 5.50 m.9.043939.799845184128498.61
24(IX)5.50 m. to 6.00 m.9.043957.1923034391248655.89
25Citizen Information Board of size 0.6 meter x 0.9 meter ( Individual works )12622.392622.39
Total Activity 233000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper0.63143651000631.4365
20297-Stone Aggregate(single size): 10 mm nominal size1.36114650884.741
30325-Blasting powder78.609048564402.106688
40326-Blasting fuse (fuse wire)85.7108282399.9024
50367-Portland Cement2.0307863640012997.03232
60368-White cement 0.0002189156263.4205314
70983-Fine sand (zone IV)2.923111110252996.1888775
81005-Twisted steel/deformed bars3.4705335690023946.68115
93-Display Board / CIB110001000
107335-Binding wire3.3052760198.3162
117900-Modular common burnt clay bricks of class designation 7.5150.85.2784.16
12MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT0.05250026
13MR6007-Hier Charges for Centering6.1876784194.786
14MR6032-Snowcem/ durocem0.00041792600010.8654
15MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)4.164497903289.9471
Total Material 57800