Work Code: 1703004005/DP/22012034572894 (CPW NIRMAN SAMUDAYAK BHAWAN PATHE BALE BABA STHAN PAR)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2022-2023 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 2/10/2022 Work start date : 11/12/2022
Present status : Existing Proposed Status : Constr of Continuous Contour Trench for Comm
Tech Sanction Details
Technical Sanction No. : 005/2798 Sanction Date : 11/11/2022
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost 15th Finance Commission scheme2 scheme3 Total
832000 548000 0 0 0 0 0 548000 0 1380000
Financial Sanction Details
Financial\Administrative Sanction No: 8/005 Financial\Administrative Sanction Date 25/11/2022
Fin. Sanc. Amt. (in Rs) NREGA:1380000 15th Finance Commission
0
Scheme 2
0
Scheme 3
0
Total
1380000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises7000.38266
2Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.7006.654655
3Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil196.88148.3329203.2104
4Earth work in rough excavation, filling excavated earth into depressions on banking as directed, top surface to be levelled and neatly dressed.-Dense or hard soil39.381374.6554133.717
5Extra rate for providing and mixing water proofing material in cement concrete work in the proportions recommended by the manufacturers.720144.08103737.6
6Random/ uncoursed rubble masonry in plinth and foundation, stones laid dry, well bounded, faced with selected stones and built with through stones evenly placed at the rate of two per sqm325.52363.84769429.92
7Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:5 (1cement, 5sand)40.13920.69157219.669
8Stone shelves fixed in walls in cement mortar 1:3 (1cement, 3sand) I/c finishing complete.-30 mm thick1050109.18114639
9contingency1460001146000
Total Activity 1380000
S.NoMaterialQuantityUnit PriceTotal
120 MM BT matel10140014000
240 MMmatal40173.246929.6
3cement Begs400370148000
4Contangancy200012000
5mooram13226.382942.94
6Sand (mortar)1501600240000
7Soten Transportation Charges325.5411.77134031.135
Total Material 548000