S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Excavation in trenches for foundations and for pipes, cables, etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out and-Disintegrated or soft rock (not requiring blasting) | 23.04 | 76 | 1751.04 |
2 | Filling foundation and around masonry work with moorum I/c ramming layers and watering. | 21.6 | 349.42 | 7547.472 |
3 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 3.46 | 4114.4 | 14235.824 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 29.34 | 2545.5 | 74684.97 |
5 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal) | 0.6 | 3488.2 | 2092.92 |
6 | False work for R.C.C. and P.C.C. work in plinth and foundation | 35.11 | 138.7 | 4869.757 |
7 | Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars | 639.63 | 52.5 | 33580.575 |
8 | Transportation of metal | 1 | 28960.48 | 28960.48 |