S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Dag-beling-Single spade stroke minimum 75mm deep | 240 | 0.5 | 120 |
2 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 64.6 | 3478.5 | 224711.1 |
3 | False work for R.C.C. and P.C.C. work in plinth and foundation | 179.36 | 154.2 | 27657.312 |
4 | Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide) | 234 | 6.3 | 1474.2 |
5 | Collection of approved soil having CBR not less than 5, including stacking at quarry. | 51.41 | 126 | 6477.66 |
6 | Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for | 51.41 | 6 | 308.46 |
7 | Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for | 64.6 | 32 | 2067.2 |
8 | Transportation of metal | 14.21 | 193.05 | 2743.2405 |
9 | Transportation of metal | 54.91 | 214.5 | 11778.195 |
10 | Transportation of metal | 27.78 | 193.05 | 5362.929 |
11 | Transportation of metal | 51.41 | 107.64 | 5533.7724 |
12 | Site clearance, cutting grass, raking into heaps and removing off the premises | 48.96 | 97.7 | 4783.392 |
13 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Disintegrated or soft rock (not requiring blasting) for Tank Work | 163.76 | 97.7 | 15999.352 |