Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 28-Sep-2024 12:08:46 AM 
Back  
State: MADHYA PRADESH District: DHAR Block: NALCHHA Panchayat: Aamkho
Work Code: 1722005067/WC/9993649626 (KAPILDHARA KUP NIRMAN JHUMKA KHUMANAMKHO)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 28/2/2014 Work start date : 3/3/2014
Present status : Non-existent Proposed Status : Artificial Recharge of Well Through Sand Filter
Tech Sanction Details
Technical Sanction No. : 2816/13-14 Sanction Date : 28/2/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
107000 72000 0 0 0 0 0 72000 0 179000
Financial Sanction Details
Financial\Administrative Sanction No: 86/13-14 Financial\Administrative Sanction Date 2/3/2014
Fin. Sanc. Amt. (in Rs) NREGA:179000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
179000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard110001000
2Pumping out water caused by springs tidal or river seepage, broken water mains or drains or well point pumping and the like.8149.13977.1
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)1.5621903416.4
4Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:5 (1cement, 5sand)15.332589.739700.101
5Collection of stone chips. quarry spalls or rubble (maximum size 0.004cum) Black trap, basalt or granite.-Other then black trap Basalt or granite9112.81015.2
6Transportation of metal 9108.18973.62
7Transportation rates for Lime (fat), Hydraulic or any other.18132.232380.14
8Providing and laying in trenches 6.0kgf/sqcm working pressure polyethylene pipes of the following outside diameter high density complete with special flange compression type fitting (earth work in trenches is to be measured and paid for separately)-50 mm dia.461.4245.6
9Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work86.39122.0710545.6273
10Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard moorum for Well Work60.3151.59135.45
11Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Disintegrated or soft rock (not requiring blasting) for Well Work63.76423.627008.736
12Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard rock requiring blasting for Well Work114.77621.771352.509
13Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders.9100.3902.7
14Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point.9139.11251.9
15contingency160656065
Total Activity 179000
S.NoMaterialQuantityUnit PriceTotal
120 MM Graded Metal1750750
2Blasting Holas18511020350
3Brick70003.524500
4Cement253007500
5CONTANGANCY160006000
6desal pump rent130003000
7Display board110001000
8Masonry Stone000
9P V C PIPE1200200
10sariya000
11sattring26001200
12TRAINSPORT CHARGE35001500
13रेत415006000
Total Material 72000