S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Filling foundation and around masonry work with moorum I/c ramming layers and watering. | 0.39 | 145.4 | 56.706 |
2 | Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Lime Mortar 1: 2(1lime, 2sand) | 0.64 | 3189 | 2040.96 |
3 | Honey comb brick masonry with class 25 open bhatta or pajawa burnt brick 10cm Thick.-In cement mortar 1:3 | 5.65 | 241.2 | 1362.78 |
4 | 15mm thick cement plaster on rough side of wall in-Cement mortar 1:6 (1cement, 6sand) | 5.96 | 99.5 | 593.02 |
5 | Rough chisel dressed sand stone flooring over 20mm average thick base of cement mortar 1:5 (1cement, 5sand) with joints finished flush (Area of each stone should not be less than 0.20 Sqm.)-With 40 mm thick stone | 1.27 | 376.6 | 478.282 |
6 | Extra for making cheques of approved pattern on cement concrete floors, steps, landing, pavement etc. | 1 | 0 | 0 |
7 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work | 0.91 | 81.2 | 73.892 |
8 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard moorum for Tank Work | 1.26 | 97.7 | 123.102 |
9 | work charge | 1 | 600 | 600 |