Work Code: 1713004058/RC/22012034316950 (सुदूर सम्‍पर्क मुख्‍य मार्ग कटहा से धमाका पहुंच मार्ग Ts 1074 )
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2016-2017 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 7/11/2016 Work start date : 29/11/2016
Present status : No Road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 1074/58/2016 Sanction Date : 10/11/2016
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
366000 676000 0 0 0 0 0 676000 0 1042000
Financial Sanction Details
Financial\Administrative Sanction No: 39/58/2016 Financial\Administrative Sanction Date 12/11/2016
Fin. Sanc. Amt. (in Rs) NREGA:1042000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1042000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard115001500
2Site clearance, cutting grass, raking into heaps and removing off the premises77901.814022
3Dag-beling-Single spade stroke minimum 75mm deep28500.3855
4Collection of approved soil having CBR not less then 12, including stacking at quarry.237.552.712516.25
5Transportation of metal 2337105.66246927.42
6Transportation of metal 237.5194.2246127.25
7Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-300mm dia60971.458284
8Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making1111.521.624008.4
9Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor233723.153984.7
10Compaction of hard shoulder collected at site, i/c making 4-5% camber by tractor mounted grader or labourers, watering at OMC and compacting with 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7)237.540.19523.75
11Construction of gravel base course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more to bring the material in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clau513.71576.9296359.299
12Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clause 2.2.3 of IRC:SP:146.78508.674652.308
13Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work1111.552.758576.05
14Collection of puddle earth including stacking at quarry233752.7123159.9
15TRANSPOTATION OF CEMENT12100021000
Total Activity 1042000
S.NoMaterialQuantityUnit PriceTotal
1Board115001500
2Compaction of Earth Work1111.521.624008.4
3Compaction of Selected soil233723.153984.7
4contigency180008000
5pipe1102500102500
6Rolling Earth & moorum146.78458.667313.308
7Transportanion of hard Muram513.71526.9270673.799
8Transportation Of Earth Work233763.27147861.99
Total Material 676000